More Progress

The new parts came in, so Joe’s crew finished installing the frames and put up all but four of the panels:

11-20-13-Installing-Solar-Heating-Panels4

11-20-13-Installing-Solar-Heating-Panels5

11-20-13-Installing-Solar-Heating-Panels6

11-20-13-Installing-Solar-Heating-Panels7

11-20-13-Installing-Solar-Heating-Panels8

They will put the remaining panels up after Peter connects the plumbing and insulates the pipes. That will take a few days — possibly longer if the weather doesn’t cooperate. As usual, we’ll just have to see.

This entry was posted in Life As a Shared Adventure. Bookmark the permalink.

6 Responses to More Progress

  1. bikehikebabe says:

    Your cup is half full, not half empty. You didn’t say “Damn, they only got half of the panels put up!” 😀

    • Jean says:

      They purposely left the last ones off so Peter has room to do the plumbing. No sense wishing for things to go faster — just enjoy the adventure.

  2. tammyj says:

    agreed! always half full.
    and it looks like it might be snowing!

  3. Cathy in NZ says:

    oh Christmas snow – only all we get is out of spray cans and lumps of something plastic layered on things…

Comments are closed.