Stacking Blocks, Doing the Plumbing

They’re continuing to stack the concrete blocks:

And Peter has been working on the plumbing.

The thing on top of the long pipe sticking up is the faucet inside the greenhouse. Clearly a lot more of the structure needs to be built!

There are more pictures here and here on Flickr.

This entry was posted in Life As a Shared Adventure. Bookmark the permalink.

10 Responses to Stacking Blocks, Doing the Plumbing

  1. tammy j says:

    wow. that is going to be some greenhouse! probably well made more than some people’s homes!

  2. good foundations coming along there…going to look fabulous when completed…and great still “jobbing along”

  3. I never dreamed a greenhouse would need such a deep foundation.

  4. Ann Thompson says:

    This is going to be some fabulous greenhouse

  5. The OP Pack says:

    Everything good begins with a strong foundation. It must be encouraging to see this progress.

    Woos – Lightning, Misty, and Timber

    • Jean says:

      It’s a complicated project and all sorts of things can go wrong, so we’re hoping for the best but not holding our breath. Most of it is out of our control now so it’s best to focus on other things unless we need to take action on something.

Comments are closed.